December brings cold weather and makes outdoor work more difficult but work continues. Wooden lintels damaged by the fire are being replaced after the walls are shored. The old elevators in the Stoermer building are removed.
|
FUMC construction
|
FUMC construction (10)
|
FUMC construction (12)
|
FUMC construction (14)
|
|
FUMC construction (15)
|
FUMC construction (16)
|
FUMC construction (5)
|
FUMC construction (6)
|
|
FUMC construction (7)
|
FUMC construction (8)
|
FUMC construction_2010 12 21_4463
| |
|